Skip to main content

Replace a product within a selected scope

Replace a product within a selected scope

Context

After selecting the new product, the Confirm button and its arrow let you choose the replacement scope.

Starting point

Product selection window → Confirm arrow

Prerequisites

  • Select the new product from a procedure using the old one.

Steps

1. Replace in a single procedure

Check the old and new products in the selection window, then click Confirm directly. The change applies only to the procedure from which you opened the window.

2. Open the replacement menu

To change several procedures, click the small arrow next to Confirm at the bottom right. The menu offers Replace throughout the plan, throughout the zone or throughout the surface.

3. Apply the selected scope

Click the required option. Only procedures using the current product within that scope are affected. If recommendations differ, a window allows parameter adjustment: see page 17.

Expected result

Procedures using the old product are changed within the selected scope.

Remember

  • Then expand the procedures concerned and check product, dosage, temperature and tasks. Replacing the product does not remove the need for this review.

Illustrations

Reference screenshot — source guide page 16

See also