Advanced Search
Search Results
363 total results found
How can I add a procedure from the current plan to the favourites?
In step 2, drag the plan procedure directly to the list of favorites on the left. You can then take it back to another surface.
How can I add a procedure from another plan to the favourites?
Open Import elements, then Available plans, and choose the source plan. Expand it to the procedures and use the command to add them to favourites.
How to reuse a favourite in another surface?
Look for the procedure in the left list and drag it into the target surface. Then check its settings for this destination.
Does adding a procedure to favourites also add it to the library?
The guide distinguishes the list of favorites from the procedure library. To resume a plan procedure in the library, use Import procedures from that library; do not confuse the two operations.
Are the favourites permanently kept from one plan to another?
The guide describes a working list for the current plan. It does not specify retention between sessions or plans. Prepare the library for a reusable reference collection.
How do I add a cover page or poster to the plan?
In Step 3, search the document in the left library and drag it to Introduction to place it before the plan or to Conclusion to place it after.
What is the difference between Introduction and Conclusion?
Introduction places the documents before the content of the plan; Conclusion places them after. The library panel is on the left, Introduction in the middle and Conclusion on the right.
How to change the order of the annexes?
In step 3, reorder documents by drag-and-drop into the desired panel, and then check their order in the final rendering.
How to put a follow-up sheet after the plan?
At step 3, find the sheet in the library and drag it into Conclusion. At step 5, check the generated sheet and the surfaces it includes.
Why do dynamic documents have to be checked at the end?
Their content is generated according to the plan. In step 5, check the products actually present, the surfaces to follow, the procedures and the order of the annexes.
A document is not in the list of appendices: what to check?
Check the used Company or Group library and prepare the document in the document library if necessary. The guide describes New document to write and import PDFs to retrieve a file.
What is a static document?
Its content stays the same between plans: for example a no-smoking poster, general instructions or a cover page.
What is a dynamic document?
Its content is generated from the plan: zone and surface monitoring sheets, product sheets with or without QR codes, or procedure details with one page per procedure.
Can I get one page by procedure?
The guide quotes a dynamic document detailing the procedures, with one page per procedure. Select the corresponding available document in your library and check its final rendering.
Do the follow-up sheets cover the surfaces of my plan?
Weekly or monthly dynamic fact sheets are generated from the zones and surfaces of the plan. Check the pages produced in Step 5.
Can we attach a list of articles with QR codes?
The guide mentions dynamic item sheets with or without QR code. Their availability depends on the documents in your library; check that they contain the items in the plan.
How to change the presentation of the plan?
In step 4, click on the desired theme in the list on the left. The preview of the first page appears on the right. Compare the proposed themes and then proceed to step 5.
Why do I have different themes from another company?
The available themes depend on the installation. The guide does not guarantee an identical list for all companies.