Advanced Search
Search Results
363 total results found
How do I add a surface within a zone?
In step 2, locate the zone and use + of the surface level within this zone. Name the surface and add its procedures.
How to add a procedure to a surface?
At step 2, click + at the Procedure level within the relevant surface. Name the procedure and expand it to enter its parameters and tasks.
How to move one surface to another zone?
Grab the four arrow handle from the surface, hold the mouse button, move it to the target zone and release. Expand the destination if necessary and check the hierarchy obtained.
How to change the order of the plan elements?
Use the four arrow handle of the element and drag it to the desired position. Then check its position and level.
How to copy an item by dragging it?
In Step 2, hold Ctrl during drag-and-drop from the zone, surface, procedure or task to another location. The combination creates a copy; then check its destination.
What key to use to copy by drag-and-drop on Mac?
Hold the Control key while dragging on a Mac. The documentation specifically confirms Control, not Command, for this operation.
Why was my element moved instead of being copied?
Without Ctrl, or Control on Mac, drag and drop moves the item. For a copy, hold this key during drag-and-drop and check the result.
What levels can I copy with Ctrl and drag-and-drop?
Copying by Ctrl and drag-and-drop refers to the zones, surfaces, procedures and tasks of the plan in step 2.
How to remove a useless zone?
Click on the Trash of the item to be removed. Before deletion, check the elements it contains, and then check the remaining content in the plan.
Can I preview the plan during its construction?
Yes. The preview button at the top right of the worksheet allows you to view the rendering during the customization of the plan.
I can't put an item in the right place: what to check?
First expand the destination to locate the location, use the four arrow handle and check the source level and target level. For a copy, the right click and the paste commands are another documented method.
Where should I right click to copy an element?
Right-click on the designation, i.e. the name of the zone, surface, procedure or task. From the menu that opens, choose Copy.
How do I paste a surface before another surface?
Right click the source surface's name and copy it. Right click the target surface's name and choose Paste before.
How do I paste a procedure after another procedure?
Copy the source procedure, right click the target procedure's name and choose Paste after. Both elements must be at the same level.
What does Paste inside do?
Paste inside inserts a surface in a zone, a procedure in a surface or a task in a procedure. Right-click on the name of the item that must contain the copy.
How to copy a procedure to another surface?
Right click the procedure’s name and choose Copy. Right click the other surface’s name and choose Paste inside. Then expand the copy and check its settings.
Can we memorize several types of copied elements?
The application can store a copied zone, surface, procedure and task separately. Choose the paste command appropriate to the target level.
What is the difference between Paste before and Paste inside?
Paste before inserts the copy before an element at the same level. Paste inside inserts it into a parent element, for example a procedure into a surface.